Output: DPDT.
Lighting: LED.
Operating voltage: 12 VAC/VDC.
Pushbutton colorsymbol: R: red, Y: yellow; PY: pure yellow
G: green, A: blue; PW: pure white; B: black *2.
Item: Momentary operation (Self-resetting).
Separate Construction with.
Cylindrical 16-dia. Body.
Miniature design of 28.5 mm, the smallest class in the industry.
Detachable Switch.
The same contacts can be used for both standard loads and microloads
OAS-144
Easy-to-wire terminal arrangement.
Certified for EN 60947-5-1. Cable: PUR.
Cable core number (core): 3.
Cable outside diameter: 4.3mm.
Cable outlet direction: L type.
Cable length L:5m.
Small round type waterproof connector.
Small waterproof connector can meet the requirement of protection IP67.
Is the ideal choice for a variety of FA and QA applications.
As with connector cable products, so no need for wiring operation.
Type: square.
Screen mode: no segmentation.
Light way: LED.
Power supply voltage: DC5V.
Operation Department color: yellow.
Square 40mm body of the indicator light series.
The same type as the A3S series button switch.
Easy to install from the front panel and no tools to carry out the lamp replacement. Type: 1a1b welding terminal.
Shape: round.
Type: General load.
Motor function: alternate action (self retaining).
With light: LED with light.
Using voltage: DC24V.
Operation Department color: green.
20mm long, with 12 round series
High brightness all one side light.
Because it is round, so easy to punch.
Miniaturization, operation feel good. Time specification: Instantaneous type.
Current setting range: 2 to 8 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indicated from the start of operation.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
OAS-144 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=OAS-144&select=5