Model: C200H-CN221.
Cable length: 200cm.Specifications: Standard type.
Impact resistance: 400W.
Resistance to impact resistance: 35.
The use of resistance to consume the motor regenerative energy, thereby reducing the time to slow down.
Alarm output terminal of braking resistor.
When the temperature relay of the braking resistor is activated, a circuit for cutting the main power supply of the frequency converter is formed
B3F-1002-M Output: SPDT.
Lighting: LED.
Operating voltage: 12 VAC/VDC.
Pushbutton colorsymbol: R: red, Y: yellow; PY: pure yellow
G: green, A: blue; W: white; B: black *2.
Item: Momentary operation (Self-resetting).
Separate Construction with.
Cylindrical 16-dia. Body.
Miniature design of 28.5 mm, the smallest class in the industry.
Detachable Switch.
The same contacts can be used for both standard loads and microloads.
Easy-to-wire terminal arrangement.
Certified for EN 60947-5-1. Shape: tin dipping L type terminal.
Pole number: 50.
Pole pole number: 2.
Minimum packing unit: 40.
Printed board connector core, MIL specification standard.
Through the use of new productivity design, high reliability and low price synchronization.
A box type plug (XG4C) which is convenient for saving space is provided in the province.
A press type plug (XG4E) capable of using the relay is provided.
Will be the company''s loose wire connector (XG5) - specific plug (XG8) and PCB type.
(XG2) combined use of various types of packaging can be achieved.
Suitable for the company''s own development of a simple locking lever can make the unique plug (XG8) and,
Box type plugs (XG4C) can also be locked.
MIL specification (MIL-C-83503) standard.
Standard product conforms to the UL specification (No. E103202 File) certified products. Time specification: Inverse type.
Current setting range: 20 to 65 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indicated from the start of operation.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
B3F-1002-M Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=B3F-1002-M&select=5